Communities, Retreats & Experiences / Nashville and Davidson County, Tennessee

Lickton Pike's two-lot plat: approval is not the finish line

Metro approved a two-lot final plat on Lickton Pike with rural-subdivision variances and conditions. Recording, access, water corrections, septic review, and a fitted housing plan still determine what the approval is worth.

Published 2026-11-16Checked 2026-11-16UPP Project Blog

The question in plain English

Metro Nashville's Planning Commission approved Case 2026S-148-001 on November 12: a final plat creating two lots from portions of three properties on Lickton Pike. The vote included three variances from the rural subdivision rules and conditions in a staff memo. Does that approval mean two ready-to-build or ready-to-sell home sites now exist? No. The approval is an important milestone, but the final plat still has to be corrected, signed, and recorded. Access details, water comments, septic systems, topography, building placement, utilities, title, construction cost, financing, and market fit remain property questions. This Field Note uses a public planning case, not an Urban Planning Pros or private-client project.

The short answer

Treat the Commission vote as permission to finish the plat process, not permission to skip due diligence. Obtain the approved motion, staff memo, final mylar, agency markups, survey, title, and recording status. Confirm which parts of the three existing tracts will become each new lot and whether the remaining land and improvements still work. Then fit a conservative single-family plan to each lot using the recorded boundaries, existing structures, setbacks, right-of-way, driveway sight distance, slopes, septic areas, utilities, drainage, and fire access. Test a triplex or quadplex only if Metro confirms a lawful path. Compare a sale and a hold after assigning every remaining cost and deadline to the same plan.

What is current on November 16

Metro's action agenda records a 7-0 approval with conditions, including variances to Section 4-2.5 of the Subdivision Regulations and conditions in the staff memo. The case covers about 5.5 acres in the AR2a agricultural-residential district. The proposed lots are about 2.70 and 2.53 acres, with roughly 200 and 209 feet of Lickton Pike frontage. Staff identified Lickton Pike as a collector avenue with about 50 feet of existing right-of-way. The final conditions require mylar revisions, compliance with reviewing agencies, Metro Health's signature before recording, and recording with the Register of Deeds within one year of the Commission approval. An approval that expires before recording is not a durable property milestone.

Why the variances matter

The rural rules use surrounding development to test compatibility. Staff calculated an average front setback of about 215 feet, while the plat requested 127 feet. The proposed lot depths were about 422 and 455 feet, below the calculated 515-foot requirement. For lot size, the surrounding-parcel formula produced a 17.13-acre minimum, far above the proposed lots. Staff nevertheless supported variances because nearby setbacks, depths, and lot sizes vary widely; some nearby lots are smaller than the proposal, while one 72.4-acre parcel materially affects the average. The lesson is not that the rules disappear. It is that this approval rests on a case-specific record and conditions. Another property cannot borrow these variances by analogy.

Start with two conservative single-family plans

AR2a and the final plat point first to a rural single-family baseline. Place the recorded lot lines, right-of-way reservations, existing houses, septic tanks and disposal areas, wells or water service, steep slopes, drainage paths, utilities, easements, trees, driveway options, and fire access on one current survey. Show the setbacks that survive the corrected mylar and verify whether each existing improvement stays wholly inside its new lot. Then budget survey and recording work, health and utility corrections, driveway and sight-distance work, grading, drainage, septic repair or replacement, utilities, design, permits, construction, financing, insurance, taxes, contingency, and sales expense. The approved lot count is two; it is not a construction budget or a finding that two new houses fit.

A triplex or quadplex is a separate zoning and systems test

Do not multiply the two-lot approval into six or eight homes. A triplex or quadplex changes the zoning and building-form question and may change parking, fire separation, access, septic loading, water demand, meters, stormwater, trash, lending, insurance, ownership, and maintenance. Ask Metro Planning, Codes, Water Services, Health, Fire, and transportation reviewers to confirm the exact path for the proposed number of homes and whether a rezoning, specific plan, site plan, or other approval would be required. Fit the buildings, parking, septic reserve, driveways, emergency access, utilities, and drainage on the recorded survey. If the agencies confirm only detached single-family use, that is the plan to underwrite until a different approval is actually obtained.

Recording, access, water, and septic are still live work

The agency record is mixed in a useful way. Fire, stormwater, Nashville DOT, and Metro Health recommended approval. Traffic approved with conditions to be set during later site-plan or building-permit review, including possible traffic studies, driveway spacing, and sight triangles. Water Services returned the submittal for corrections and deferred septic systems to Metro Health. The final conditions require Health's signature on the mylar before recording. Confirm the corrected water comments, the exact legal and physical access for each lot, usable sight distance, any driveway permits, the approved septic area and reserve area, and the recorded plat. A buyer, lender, or builder should not have to infer those answers from the 7-0 vote.

Compare selling and holding at the same milestone

A sale before recording transfers correction, signature, deadline, and recording risk to the buyer and may invite a discount. A sale after recording can present two legal lots, but it still does not prove a new house, driveway, septic system, utility connection, or permit. Building detached homes for sale can return capital through two closings, but the first home should not consume access, septic, drainage, or financing capacity needed by the second. Holding lawful homes for rent adds vacancy, management, repairs, taxes, insurance, owner-paid utilities, replacement reserves, and debt service. A triplex or quadplex hold case belongs in a separate column until lawful. Compare sale and hold values on the same survey, approval status, agency scope, schedule, cost date, financing terms, and contingency.

Public demand supports study, not a parcel promise

The Census Bureau estimates Davidson County at 745,904 residents in 2025, up 4.2 percent from the 2020 estimate base, with 5,632 building permits during 2025. FRED's October 2026 Realtor.com estimates show 12,145 active listings and 63 median days on market for the Nashville metropolitan area, compared with 10,852 active listings and 61 days one year earlier. That combination supports continued housing study and conservative sales timing. It does not establish demand, price, rent, occupancy, approval, septic capacity, absorption, financing, or profit for the Lickton Pike lots. Use current comparable sales and rentals, competing listings, buyer interviews, rent evidence, financing quotes, and a realistic delivery calendar before choosing a product or exit.

What the anonymous site signal says

Urban Planning Pros reviewed 3,178 anonymous content events from October 17 through November 16: 3,162 page views, nine service clicks, six Review My Property clicks, and one guide read. The home page had 230 views, request-a-quote 120, booking 91, insights 66, services 53, property-review-before-drawings 45, can-excess-dirt-be-sold 42, and phased sales and rental homes 40. Every city and referrer field was blank. That activity supports a practical plat, feasibility, and sell-versus-hold guide, but not a demand claim for Lickton Pike. The public Google Trends feed had no relevant entry in today's sample; missing is not zero. No live Similarweb connection was available, so no Similarweb value was used or invented.

The community test belongs in the plan

Metro's Rural Maintenance policy is intended to maintain the character of rural neighborhoods through their development pattern, varying setbacks, building form, and land uses. Staff found the two-lot proposal consistent with that policy, but later building choices still affect the street and neighbors. Test safe driveway placement, emergency access, septic performance, runoff, tree removal, grading, lighting, construction traffic, privacy, and the visual relationship between new and existing homes. Keep work inside the land legally controlled and protect the second lot while improving the first. A plan that resolves access, wastewater, drainage, and edge conditions early can reduce review friction, construction surprises, insurance concerns, resident problems, and later conflict.

What to verify before choosing the plan

Collect the action agenda, staff report and memo, corrected mylar, final signatures, recorded plat, deed and title, boundary and topographic survey, right-of-way records, easements, existing-improvement survey, zoning confirmation, driveway and sight-distance comments, water corrections, septic permits and reserve areas, utility information, drainage and soil evidence, concept plans, construction estimates, market evidence, financing terms, and schedule. Confirm the one-year recording deadline and check the Register of Deeds rather than assuming recording occurred. Mark each item confirmed, estimated, or unknown. Then compare the conservative single-family plan, any separately lawful triplex or quadplex, sale at defined milestones, and long-term cash flow. Urban Planning Pros can organize the first screen through a Preliminary Property Review. Use Review My Property below to begin with the actual land. Information was checked November 16, 2026.

Source note

Preliminary Property Review →

The land decision toolkit

Keep the full feasibility framework in reach.

Jeremy Wenger’s Before the Land Deal Gets Expensive brings the land questions into one practical playbook.

View the book and purchase options →

Your next step

Put the question against your actual property.

Use the contact form to share the address or parcel, your intended use, existing records, and the decision you need to make. Urban Planning Pros can help define the next feasibility or project-service scope.

Review My Property ↗